All rankings
New Hampshire · EPA ECHO (national)

PORTSMOUTH-PIERCE ISLAND SANITARY SEWER SYSTEM

Permit NH0100234

—
No waterway impact reported
Reported events
2
Total volume
11 gal
Reached waterways
0 (0%)
Reporting since
2025

What caused the overflows

Grease / FOG
1
Other / Unknown
1

Reported overflow events (showing 2 of 2)

DateVolumeCauseReached waterReceiving water
Mar 8, 20261 galOther / Unknown——
Dec 30, 202510 galGrease / FOG—South Mill Pond via the MS4 System

Source: EPA ECHO (national). Volumes are utility-reported estimates. Some events lack precise coordinates or volumes.